Kitchen remodeling

A new layout or a new look: walls moved, plumbing and wiring brought up to code, cabinets, counters, floors and lighting, managed as one job.

A newly remodeled kitchen with white cabinets, a gas range and wood-look floors

A kitchen remodel touches almost every trade: demolition, framing, plumbing, electrical, drywall, cabinets, counters, tile, flooring and paint. The difference between a smooth job and a long one is mostly planning: a design that is fixed before demolition, materials ordered before the walls come down, and one person who keeps the trades in order.

Design first

We start with a visit and measurements, then drawings of the layout you choose and a list of every finish. You get a fixed written price for that scope. Changes later are priced in writing before they are made.

The work

  • Protection: floors covered from the door to the kitchen, dust walls with zip doors, and an air scrubber where needed.
  • Rough-in: plumbing, wiring and ducts moved to the new layout, then inspected before the walls close.
  • Finishes: drywall, cabinets, counters templated and installed, backsplash, flooring, lighting and paint.
  • Final inspection: and a walk-through with you, with a written list of anything left to finish.

Older Knoxville homes

In older houses, opening a kitchen wall can show old wiring, galvanized pipes or past water damage. We tell you at the start what we expect to find, and we price the likely repairs as allowances, so you know the range before work starts.

What is included

  • Design visit, measured drawings and a fixed written price
  • Permits and inspections
  • Demolition, plumbing, electrical and drywall
  • Cabinets, counters, tile and flooring
  • One project lead from start to finish

Questions about this service

How long does a kitchen remodel take?

Usually six to ten weeks on site once cabinets arrive. Ordering cabinets can take several weeks before that, so we plan the design early.

Can we live in the house during the work?

Most families do. We set up a temporary kitchen corner with a sink or a microwave if you like, and close off the work area from the rest of the house.

Can you move a wall?

Often. A bearing wall needs a beam sized by an engineer and a permit; we arrange both and include them in the price.

Book a design visit

Tell us about the house and what you have in mind. We reply within a working day to set a time.

Hours
Mon–Thu 8 am–5 pm · Fri 8 am–4 pm · Design visits by appointment

Example form: nothing you type here is sent or stored.