Example website by Ingenious Services. Harlowmere Builders is made up; its builders, prices and words show where yours go.

Get a site like this
Harlowmere BuildersCall (865) 555-0171

What we build

Home additions

A bedroom suite, a bigger kitchen or a family room added to your house, from the survey and drawings to the permit, the build and the final inspection.

New timber roof framing going up over the walls of a new room

Adding on is often the best way to get the space you need without leaving a neighborhood you like. It is also the largest project most homeowners ever take on, so it pays to understand the steps before the first drawing.

Before drawings

We start with the lot: how far the addition can come from the property lines, where the utilities run, how the land slopes and drains. Knoxville and Knox County set different rules, and some neighborhoods have design overlays. We check these before you spend money on drawings.

Drawings and permit

Our designer draws the addition and how it connects to the house. Where beams, foundations or a second story call for it, a structural engineer signs off. We submit the permit application and answer the reviewers' questions.

The build

  • Foundation: footings, then a crawl space or slab to match the house.
  • Shell: framing, sheathing, roof and windows, so the addition is dry before the house is opened.
  • Connection: the opening into the house made last, with dust walls up.
  • Systems and finishes: wiring, plumbing, heating and cooling, insulation, drywall, trim and floors.

Every stage is inspected before the next one starts, and you get a schedule that is updated weekly.

What is included

  • Site visit, zoning and setback check
  • Drawings by our designer, engineering where needed
  • Building permit and every inspection
  • Foundation, framing, roof and siding matched to the house
  • Electrical, plumbing, HVAC and finishes

Questions about this service

Do I need a permit for an addition?

Yes. An addition needs a building permit from the city or county, and often a survey to show it meets the setbacks. We prepare the drawings and apply for you.

How long does an addition take?

Drawings and the permit take a few weeks to a few months. The build itself usually takes three to five months, depending on size and the weather.

Will it look like part of the house?

That is the goal. We match the roof pitch, siding, trim and windows, and tie the new roof into the old one.

Book a design visit

Tell us about the house and what you have in mind. We reply within a working day to set a time.

Hours
Mon–Thu 8 am–5 pm · Fri 8 am–4 pm · Design visits by appointment

Example form: nothing you type here is sent or stored.